Flows/The admin changes a rule

Flows

The admin changes a rule

Tom changes a stall threshold, sees its impact before saving, and the change applies from then on, on record and restorable. Steps 1 to 11 are the main path, 12 to 18 the alternative paths.

Actors
Tom Ashworth (Admin) makes the change; Rhys Calloway (Partner / MD) gets the one summary alert; Dana Whitfield (Partnerships PM) sees why a Site stalled.
Starts at
Settings › Rules, Mon 9 Nov 2026: the stall rule No contact at 14 days.
Ends at
The rule at 10 days from Tue 10 Nov 2026, badges recomputed, October and the locked weeks untouched, the change in the history with Restore.
Step 1 of 18 This screen is not drawn yet
  1. 1 Open the rules

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Working-day calendar

    • Fri 20 Nov 2026Company closure · away day
      Closure
    • Fri 25 Dec 2026Christmas Day
      Bank holiday
    • Mon 28 Dec 2026Boxing Day, substitute day
      Bank holiday
    • 29 to 31 Dec 2026Company closure · Christmas
      Closure

    The 5- and 15-working-day clocks and the approver’s 1 working day skip weekends, England & Wales bank holidays and company closures; the other clocks count every day.

    Tom clicks Settings 1 in the sidebar, then Rules 2, and keeps the segment on Stall rules 3. All stall rules lists each rule with its threshold and the date it last changed; a rule whose threshold is empty would read Off.

  2. 2 Pick the rule

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Tom clicks the row No contact 1. The edit card opens: a Site stalls after this many days without contact, now 14 days; on the right, the Change history of this rule from the audit log.

  3. 3 Enter the new value and the date

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Tom types 10 in New value 1 and sets Effective from to Tue 10 Nov 2026 with the date picker 2. Under the field: Whole days, 5 to 30; under the date: closed months and locked weeks do not change.

  4. 4 System: the impact preview

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    3 Sites would show stalled, against 1 today
    • Stalled today at 14 daysLea Bridge Works (14 days)
    • New at 10 daysHeron Fields (11 days) and Kingsmead (10 days)
    Mill Pond is On Hold · Parked: stall rules skip it. Rhys Calloway gets one summary alert, not one per Site.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Before anything is saved, the system counts the Sites whose badge would change: 3 would show stalled against 1 today, the new ones named with their days without contact. Mill Pond is On Hold · Parked and left out; Rhys Calloway would get one summary alert.

  5. 5 Confirm and save

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    3 Sites would show stalled, against 1 today
    • Stalled today at 14 daysLea Bridge Works (14 days)
    • New at 10 daysHeron Fields (11 days) and Kingsmead (10 days)
    Mill Pond is On Hold · Parked: stall rules skip it. Rhys Calloway gets one summary alert, not one per Site.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact10 days9 Nov 2026 · from 10 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 14 → 10 daysTom Ashworth · Mon 9 Nov 2026, 10:20 · applies from Tue 10 Nov 2026
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026
    Saved. Applies from Tue 10 Nov 2026

    Tom clicks Confirm and save 1. The change goes to the audit log with its old and new values: a toast says it applies from Tue 10 Nov 2026, the row reads 10 days with the new date, and the history gains 14 → 10 days with a Restore button.

  6. 6 System: apply from then on

    Updated 12m agoJMCHRC
    LE-022

    Heron Fields, Colchester

    Under OfferLand
    Partnerships PMDWDana Whitfield
    Region · unitsLondon & East · 46
    StatusActive
    Construction InvolvedNo
    Deal Health72Recomputed Tue 10 Nov 2026[?Q-001] Provisional formula

    Stalled since Tue 10 Nov 2026

    Rule
    No contact
    Threshold applied
    10 days, from Tue 10 Nov 2026 · was 14
    Last contact
    Thu 29 Oct 2026

    Records already saved keep their saved grade; Deal Health recomputes on live Sites only.

    Activity

    Tue 10 Nov 2026

    1. SystemSystemRule

      Stall rule fired after a threshold change

      Audit entry: No contact 14 → 10 days · Tom Ashworth · Mon 9 Nov 2026, 10:20

    On Tue 10 Nov 2026 the stall evaluation runs with 10 days. Each new firing marks the Site with a stalled badge naming the rule and writes a system activity entry carrying the setting change’s audit entry, as on Heron Fields. Saved records keep their grade; Deal Health recomputes on live Sites.

  7. 7 System: the alerts

    Stall alert: Heron Fields
    Valere CRM <notifications@valere.example> → Dana Whitfield <dana.whitfield@valere.example>
    Valere CRMNotification
    Stall alert

    Heron Fields has stalled

    A stall rule fired after a threshold change: no contact for 10 days or more.

    LE-022Heron Fields, Colchester
    Under Offer
    Deal Health
    72
    Status
    Active
    Fee
    £310,000
    Rule
    No contact: threshold 10 days, set by Admin, changed Mon 9 Nov 2026, applies from Tue 10 Nov 2026
    Last contact
    Thu 29 Oct 2026

    You get one alert when the rule starts, not one a day. Rhys Calloway gets one summary of the threshold change as MD, not one alert per Site.

    Open Heron FieldsSee why the rule fired

    You received this because you own the Site. It comes on its own because you chose not to have a digest; with a digest it would be batched there.

    Valere CRM · from the Valere notification mailbox, only to Valere staff

    Updated 12m agoJMCHRC

    Good morning, Rhys

    Tuesday 10 November · 3 decisions wait for you

    Weighted fee pipeline£1,386,000£94,000 vs last month
    Active Sites413 more than last month
    Stalled Sites32 more since the threshold change
    Legal blockers21 more than last week

    Needing MD decision

    Exception requests and overrides
    • Contractor below AcceptableLea Bridge Works · Conor Higgins · Thu 5 NovBest bid graded Unviable; no other bid within budget
    • Gate item without evidenceHatch Farm · Jamie Morgan · Fri 6 NovInstruction Approval: LPA highways comments not yet published
    • Duplicate-send overrideHeron Fields · Dana Whitfield · todaySecond send to the same buyer group

    Stalled Sites

    The rule that fired, the threshold applied
    • Lea Bridge Works Acceptable OfferNo contactThreshold 10 days, changed 9 Nov
      41
    • Heron Fields Under OfferNo contactThreshold 10 days, changed 9 Nov · new
      72
    • Kingsmead LegalsNo contactThreshold 10 days, changed 9 Nov · new
      49

    Legal blockers

    Critical items late, or no next action
    • Church Farm LegalsCritical item past deadlineLand contract draft, with Hadley & Finch LLP for 21 days
      55
    • Kingsmead LegalsIn Legals with no named next actionStatus Awaiting since 28 Oct
      49

    Funnel conversion

    Last 12 months · weakest step marked
    • Lead to appraisal59%
    • Appraisal to instruction71%
    • Instruction to first offer85%
    • First to acceptable offer64%
    • Acceptable offer to build and CSA78%
    • HoTs to exchange83%
    • Exchange to completion90%

    Deal Health league

    Lowest first · provisional formula, admin-set weights
    • 1
      Lea Bridge Works Acceptable Offer
      41
    • 2
      Kingsmead Legals
      49
    • 3
      Church Farm Legals
      55
    • 4
      Hatch Farm Fee Discussion
      68
    • 5
      Heron Fields Under Offer
      72
    • 6
      Orchard Lane Acceptable Offer
      74

    Team snapshot

    Open and overdue actions by function
    • Land182
    • Partnerships265
    • Construction111
    • Back Office140

    The owner of each newly stalled Site gets one stall alert: here the letter to Dana Whitfield for Heron Fields. Rhys Calloway gets one summary for the whole change in the notification centre, “A threshold change made 2 Sites stall”, linking to the list of Sites, instead of one alert per Site.

  8. 8 Why did my Site stall?

    Updated 12m agoJMCHRC
    LE-022

    Heron Fields, Colchester

    Under OfferLand
    Partnerships PMDWDana Whitfield
    Region · unitsLondon & East · 46
    StatusActive
    Construction InvolvedNo
    Deal Health72Recomputed Tue 10 Nov 2026[?Q-001] Provisional formula

    Stalled since Tue 10 Nov 2026

    Rule
    No contact
    Threshold applied
    10 days, from Tue 10 Nov 2026 · was 14
    Last contact
    Thu 29 Oct 2026

    Records already saved keep their saved grade; Deal Health recomputes on live Sites only.

    Activity

    Tue 10 Nov 2026

    1. SystemSystemRule

      Stall rule fired after a threshold change

      Audit entry: No contact 14 → 10 days · Tom Ashworth · Mon 9 Nov 2026, 10:20

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Dana Whitfield, Partnerships PM

    Read only

    Change history

    No contact · from the audit log
    • 14 → 10 daysTom Ashworth · Mon 9 Nov 2026, 10:20 · applies from Tue 10 Nov 2026
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Read only: every internal role reads the history of this setting; only an Admin changes or restores it.

    Dana Whitfield clicks the stalled badge 1 on Heron Fields: the popover reads “Threshold 10 days · changed Mon 9 Nov 2026 by Tom Ashworth”. Dana Whitfield clicks See the change history 2 and reads the rule’s history, read only: every internal role reads the history of a non-sensitive setting.

  9. 9 The Monday view notes it

    Updated 12m agoJMCHRC

    Morning Meeting

    Monday 16 November · Monday: company, Interest and Offers · chair Rhys Calloway

    Thresholds changed this week: No contact 14 → 10 · Tom Ashworth, Mon 9 Nov 2026, from Tue 10 Nov 2026

    Updated 12m agoJMCHRC

    Good morning, Rhys

    Monday 16 November · 1 decision waits for you

    Weighted fee pipeline£1,386,000£94,000 vs last month
    Active Sites413 more than last month
    Stalled Sites43 more since the threshold change
    Legal blockers21 more than last week

    Needing MD decision

    Exception requests and overrides
    • Contractor below AcceptableLea Bridge Works · Conor Higgins · Thu 5 NovBest bid graded Unviable; no other bid within budget

    Stalled Sites

    The rule that fired, the threshold applied
    • Lea Bridge Works Acceptable OfferNo contactThreshold 10 days, changed 9 Nov
      41
    • Heron Fields Under OfferNo contactThreshold 10 days, changed 9 Nov · new
      72
    • Kingsmead LegalsNo contactThreshold 10 days, changed 9 Nov · new
      49
    • Orchard Lane Acceptable OfferNo contactThreshold 10 days, changed 9 Nov · new
      74

    Legal blockers

    Critical items late, or no next action
    • Church Farm LegalsCritical item past deadlineLand contract draft, with Hadley & Finch LLP for 21 days
      55
    • Kingsmead LegalsIn Legals with no named next actionStatus Awaiting since 28 Oct
      49

    Funnel conversion

    Last 12 months · weakest step marked
    • Lead to appraisal59%
    • Appraisal to instruction71%
    • Instruction to first offer85%
    • First to acceptable offer64%
    • Acceptable offer to build and CSA78%
    • HoTs to exchange83%
    • Exchange to completion90%

    Deal Health league

    Lowest first · provisional formula, admin-set weights
    • 1
      Lea Bridge Works Acceptable Offer
      41
    • 2
      Kingsmead Legals
      49
    • 3
      Church Farm Legals
      55
    • 4
      Hatch Farm Instructed
      68
    • 5
      Heron Fields Under Offer
      72
    • 6
      Orchard Lane Acceptable Offer
      74

    Team snapshot

    Open and overdue actions by function
    • Land182
    • Partnerships265
    • Construction111
    • Back Office140

    At the Monday Morning Meeting of Mon 16 Nov 2026 Rhys Calloway opens the board 1: a note reads “Thresholds changed this week: No contact 14 → 10”, for the change made in the past week. On the Executive dashboard 2 the stalled list names the rule and the threshold for each Site.

  10. 10 Closed months stay as they were

    Updated 12m agoJMCHRC

    Executive · October 2026

    Closed at the month end, 31 Oct 2026 · figures and Deal Health as snapshotted at the close

    Closed month · Locked
    Weighted fee pipeline£1,292,000snapshot 31 Oct 2026
    Active Sites38snapshot 31 Oct 2026
    Fees exchanged£240,000target £300,000

    Deal Health at the close

    snapshot 31 Oct 2026
    • Church Farm
      58
    • Heron Fields
      70
    • Lea Bridge Works
      45
    • Hatch Farm
      66
    • Orchard Lane
      72
    • Kingsmead
      52
    • Mill Pond
      38
    October stays as it was closedThe No contact change of Mon 9 Nov 2026 applies from Tue 10 Nov 2026: it recomputes nothing in a closed month. A correction would be an adjustment shown beside the frozen value, never an edit of it.
    Updated 12m agoJMCHRC

    Weekly Regional Review

    South & West · regional lead Jamie Morgan

    Locked Mon 2 Nov 2026 · Jamie Morgan
    SITEWHAT CHANGED THAT WEEKSTATE
    Hatch Farm, SindleshamSW-031 · 33 units
    Fee agreement sent to Edward Marsh for signature.
    Frozen
    Orchard Lane, WokinghamSW-027 · 52 units
    Offer review sent to the landowner; tender issued to four contractors.
    Frozen
    Kingsmead, BasingstokeSW-024 · 40 units
    Draft contract sent to the buyer’s solicitor.
    Locked On track, adjusted At risk · Jamie Morgan, 4 Nov: “solicitor quiet”
    Frozen
    Mill Pond, NewburySW-019 · 22 units
    Parked from the review: the landowner is abroad until December.
    Frozen

    A locked week is never unlocked: the threshold change of Mon 9 Nov 2026 leaves it as it was, and a correction is an adjustment beside the frozen value.

    Rhys Calloway opens October 2026 1 on the Executive dashboard: its figures and Deal Health stand as snapshotted at the close. Rhys Calloway then opens the locked week of the South & West review 2: unchanged and Locked; a correction would only be an adjustment beside the frozen value.

  11. 11 Restore

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now10 days
    New valuedaysRestored from the history: 14 days
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    1 Site would clear: Orchard Lane (12 days)Restoring is a new change: it is saved with today’s date and the entries below stay. Rhys Calloway gets one summary alert.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact10 days9 Nov 2026 · from 10 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 14 → 10 daysTom Ashworth · Mon 9 Nov 2026, 10:20 · applies from Tue 10 Nov 2026
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026
    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days16 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 10 → 14 daysTom Ashworth · Mon 16 Nov 2026, 11:30 · restored
    • 14 → 10 daysTom Ashworth · Mon 9 Nov 2026, 10:20 · applies from Tue 10 Nov 2026
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026
    Saved. 14 days restored as a new change

    On Mon 16 Nov 2026 Tom returns to Settings › Rules and clicks Restore 14 1 in the Change history. The impact preview runs again (1 Site would clear: Orchard Lane (12 days)); Tom clicks Confirm and save 2. A new entry 10 → 14 days by Tom stands on top and the earlier entries stay: restoring is a new, audited change.

  12. 12 An impact preview with many Sites

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    Most open Sites would show stalled 4 of 6 open Sites, against 1 today
    • Lea Bridge Works14 days without contactalready stalled
    • Heron Fields11 days without contactnew
    • Kingsmead10 days without contactnew
    Mill Pond is On Hold · Parked: stall rules skip it. Rhys Calloway gets one summary alert, not one per Site.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Alternative: Tom types 5 instead 1. The preview says “Most open Sites would show stalled”, folds the full list under Show all and keeps the one-summary-alert line. Tom clicks Cancel 2 and nothing is saved.

  13. 13 A value refused

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedays

    Whole days, 5 to 30: 3 is below the range

    10.5 and 0 are refused the same way, and an amber set after its red
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Alternative: Tom types 3 1. The field is in error with the rule named, whole days from 5 to 30; 10.5 or 0, or an amber set after its red, are refused the same way. Confirm and save stays disabled.

  14. 14 An empty threshold

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    This rule will not fire while the threshold is emptyAfter the save No contact reads Off here and on the MD exceptions view, and Tom Ashworth is told the rule no longer fires.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026
    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contactOff9 Nov 2026 · from 10 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026
    Saved. No contact is off while its threshold is empty

    Alternative: Tom clears the value 1. Before the save Tom reads “This rule will not fire while the threshold is empty”; after Confirm and save 2 No contact reads Off in All stall rules and on the MD exceptions view.

  15. 15 No Site changes

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    No Site’s badge would changeAt 13 days the same Site stalls as at 14. The save goes ahead and no summary alert is sent.

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Alternative: Tom types 13 1 and the preview counts no Site: “No Site’s badge would change”. Confirm and save 2 goes ahead with no summary alert.

  16. 16 The recompute fails

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    The change could not be applied; 14 days stays in forceThe recompute of the badges failed, so nothing was saved and no alert went out. Your entry is kept below: try again, or ask for help with the failure shown.Failure: the badge recompute stopped before it finished · Mon 9 Nov 2026, 10:20

    No contact

    A Site stalls after this many days without contact
    Now14 days
    New valuedaysWhole days, 5 to 30
    Effective fromClosed months and locked weeks do not change

    [?Q-002] One threshold for every stage: the thresholds per stage are set at the first workshop

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Alternative: the recompute fails. Settings › Rules shows the error “The change could not be applied; 14 days stays in force” with the failure shown to Tom; Tom’s entry of 10 days from Tue 10 Nov 2026 is kept in the form.

  17. 17 Restore refused

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact10 days9 Nov 2026 · from 10 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Change history

    No contact · from the audit log
    Restore refused35 days was allowed when it was set (range 5 to 40); since Wed 4 Nov 2026 the permitted range is 5 to 30, so it cannot be saved again. Enter a value in range instead.
    • 14 → 10 daysTom Ashworth · Mon 9 Nov 2026, 10:20 · applies from Tue 10 Nov 2026
    • 35 → 14 daysTom Ashworth · Wed 4 Nov 2026, 14:05 · restored
    • 14 → 35 daysTom Ashworth · Mon 3 Aug 2026, 09:40
    • 14 daysSeeded from the source · Mon 1 Jun 2026

    Alternative: Tom clicks Restore 35 1 on the entry of Mon 3 Aug 2026, when the range was 5 to 40; the permitted range is now 5 to 30. The restore is refused with that reason, and nothing changes.

  18. 18 A working-day change moves a clock

    Updated 12m agoJMCHRC

    Rules

    Stall rules, deal clocks, Deal Health and the working-day calendar · Tom Ashworth, Admin

    All stall rules

    An empty threshold turns a rule off
    RuleThresholdLast changed
    No contact14 days4 Nov 2026
    Tender overdue21 days12 Oct 2026
    CSA missing21 days1 Jun 2026
    Heads of Terms open over30 days1 Jun 2026
    In Legals with no named next actionOn1 Jun 2026
    Deal clock exceededClock lengths12 Oct 2026

    Working-day calendar

    Preview: the clocks whose due dates moveEvery working-day clock running over Fri 20 Nov 2026 is listed here with its due date one working day later, before anything is saved. Clocks that count every day do not move.
    • Fri 25 Dec 2026Christmas Day
      Bank holiday
    • Mon 28 Dec 2026Boxing Day, substitute day
      Bank holiday
    • 29 to 31 Dec 2026Company closure · Christmas
      Closure

    The 5- and 15-working-day clocks and the approver’s 1 working day skip weekends, England & Wales bank holidays and company closures; the other clocks count every day.

    Alternative: Tom clicks Open the working-day calendar 1 and adds a company closure 2. The same kind of preview lists the clocks whose due dates move before Tom saves.