Flows/From Heads of Terms to completion

Flows

From Heads of Terms to completion

Church Farm’s Heads of Terms signed through Adobe Sign, Legals tracked to its critical dates with weekly chasers, exchange and completion, the fees flagged until invoiced.

Actors
Dana Whitfield (Partnerships PM) runs most steps; Sophie Brennan (Land, Central) the land terms and exclusivity; Conor Higgins (Construction) the build terms and the abnormal claim; Eleanor Shaw (Partner) decides a claim above the set value.
Starts at
Church Farm, Rugby (CE-014) at Under Offer: Calder Valley Homes’ offer agreed, Westbrook Construction the preferred contractor at £6,320,000.
Ends at
Completion recorded on 4 Dec 2026 and the Site Completed; each triggered fee stays flagged “not yet invoiced” until someone marks it invoiced.
Step 1 of 21 This screen is not drawn yet
  1. 1 Mark the land and build terms agreed

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Starts once the land terms and the build terms are agreed
    LandAgreed

    Land terms agreed

    SBSophie Brennan17 Sep 2026

    Calder Valley Homes’ offer, agreed 26 Aug 2026: land £3,640,000

    ConstructionAgreed

    Build terms agreed

    CHConor Higgins18 Sep 2026

    Read from Westbrook Construction’s appointed bid: agreed build cost £6,320,000 (1 of 4 bids)

    Both gates are marked

    The Heads of Terms record can start now.

    No Heads of Terms record yet

    It is pre-filled from the agreed offer and the agreed build cost once started.

    On the Heads of Terms tab Sophie Brennan presses Land terms agreed 1 and sets the date; Conor Higgins presses Build terms agreed 2, which reads Westbrook Construction’s agreed build cost of £6,320,000. Both gate marks show with their name and date, and Start Heads of Terms is enabled.

  2. 2 Start the Heads of Terms record and record the terms

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms record

    Revision 1 · started 21 Sep 2026 by Dana Whitfield
    Type
    Pre-filled from Calder Valley Homes’ agreed offer of £9,960,000 (land £3,640,000) and Westbrook Construction’s £6,320,000
    Package

    74.2% of GDV £13,420,000

    Fees

    The Site’s 4 fee streams · Valere fee

    Overage
    Overage at 50% of sales above £13,420,000 GDV
    Conditions
    Subject to the RP board and the S106 variation
    Exclusivity date

    Active fee streams

    Effective fee rate 2.6%
    • Agency fee (RP)At exchangeAgreed£130,000
    • OverageAt the overage eventContingent£20,000
    • Contractor introductionAt JCT signing · 50/50 splitAgreed£72,000
    • Design / RMAt Reserved Matters approval · trigger to be confirmed [?Q-005]Speculative£40,000

    Total fees £262,000 ÷ package £9,960,000 = 2.6%

    Linked to

    Revision 1Every later change is a new revision; the earlier ones are kept

    Dana Whitfield presses Start Heads of Terms, picks the Type 1 and completes the Package 2, the Fees 3, the Overage 4, the Conditions 5 and the Exclusivity date 6, pre-filled from Calder Valley Homes’ agreed offer, then presses Save 7. Dana sees revision 1, the active fee streams with the effective fee rate of 2.6%, and the links to the agreed offer and bid.

  3. 3 Set up exclusivity

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Land and Build · revision 1
    Draft
    Land£3,640,000
    Build£6,320,000
    Package£9,960,000
    Fees£262,000
    Effective rate2.6%
    Exclusivity date23 Nov

    Exclusivity

    Not set up yet

    Sophie Brennan opens Exclusivity › Set up. The product suggests Standard letter, back-to-back, with the rule that made it; Sophie presses Accept suggestion 1, sets the Start 2 and End 3, adds the Milestones 4 and presses Save 5. Once sent, the period is pending signature.

  4. 4 Generate and approve the agreements

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Agreements

    Each drafted, read and approved before it is sent
    • Heads of Terms, Church FarmDana Whitfield · drafted from Valere’s template, 23 Sep 2026Draft · no gaps
    • Exclusivity agreement · Standard letter, back-to-backSophie Brennan · drafted from Valere’s template, 23 Sep 2026Draft · Sophie Brennan to approve
    Gaps: none. A required value missing from the record would be listed here, and the draft could not be approved until it is filled.
    If the record changes after approval, the approval lapses.
    Valere GroupSubject to contract

    Heads of Terms

    Church Farm, Rugby · CE-014 · Revision 1, draft of 23 Sep 2026

    Parties
    The Hale family · Calder Valley Homes · Westbrook Construction
    Type
    Land and Build
    Land price
    £3,640,000
    Build cost
    £6,320,000
    Package
    £9,960,000
    Valere fee
    £262,000
    Overage
    Overage at 50% of sales above £13,420,000 GDV
    Conditions
    Subject to the RP board and the S106 variation
    Exclusivity to
    23 Nov 2026

    Dana Whitfield presses Generate 1 on the Heads of Terms, reads the draft in Valere’s format and presses Approve 2 (or Return for changes); Sophie Brennan does the same for the exclusivity agreement. No required value is missing, so no gap blocks the approval; a change to the record after approval would make it lapse.

  5. 5 Send for signature through Adobe Sign

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Land and Build · revision 1
    Approved
    Land£3,640,000
    Build£6,320,000
    Package£9,960,000
    Fees£262,000
    Effective rate2.6%
    Exclusivity date23 Nov

    Agreements

    • Heads of Terms, Church FarmApproved
    • Exclusivity agreement · Standard letter, back-to-backApproved

    Dana Whitfield presses Send for signature, checks the Signatories 1 (The Hale family, Calder Valley Homes, Westbrook Construction) and presses Send 2; Sophie Brennan does the same for the exclusivity agreement. Each agreement then reads “Out for signature” and the Heads of Terms is issued.

  6. 6 System: signed, filed, Legals opens

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Stages

    Each move is set by the event its module records
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. LegalsSince 5 Oct
    7. Exchanged
    8. Completed
    Heads of Terms, Church FarmSigned
    1. Sent25 Sep 2026To 3 signatories through Adobe Sign
    2. Signed by all5 Oct 2026The Hale family, Calder Valley Homes, Westbrook Construction
    3. Signed copy filed5 Oct 20265 Heads of Terms/Heads of Terms, Church Farm, signed 5 Oct 2026.pdf
    4. Base for variance5 Oct 2026Variance is measured against this copy
    Status returned by Adobe Sign; nothing was typed by hand.
    ExclusivityActive

    Standard letter, back-to-back · 5 Oct to 23 Nov 2026 · signed copy filed to 5 Heads of Terms

    HoTs to exchange
    100days left
    Started 5 Oct · by 13 Jan 2027Under 100 days

    Sent to Land, Partnerships and Construction

    Church Farm, Rugby moved to Legals: Heads of Terms signed 5 Oct 2026

    • SBSophie BrennanLand
    • DWDana WhitfieldPartnerships
    • CHConor HigginsConstruction

    On 5 Oct 2026 Adobe Sign returned the signed copies. The system filed them to the Site’s 5 Heads of Terms folder, marked the Heads of Terms signed and the exclusivity active, moved the Site to Legals, started the 100-day HoTs-to-exchange clock and notified Land, Partnerships and Construction.

  7. 7 Set the critical dates and the trackers

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    Critical dates set 6 Oct 2026: exchange 13 Nov, completion 4 Dec, longstop 18 Dec, RP board 12 Nov
    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    On Legals Dana Whitfield presses Set dates 1 for exchange (Fri 13 Nov), completion (4 Dec), longstop (18 Dec) and the RP board (12 Nov), uses Add milestone 2 and Add document 3, and Update 4 as a document passes. Dana sees a countdown per date, the progress tracker with days per holder, the critical items, contracts out, and the oldest outstanding item: the land contract draft, with Hadley & Finch LLP for 21 days.

  8. 8 System: weekly chasers and updates are drafted

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula

    Drafts for the week of Mon 9 Nov

    4 drafts · from Dana Whitfield’s mailbox
    • Solicitor chaserAlex Rowan · Hadley & Finch LLPChurch Farm, Rugby: open items this weekAwaiting approval
    • Board-date chaserSarah Lomax · Calder Valley HomesChurch Farm: your board paper for 12 NovemberAwaiting approval
    • Weekly update, RPSarah Lomax · Calder Valley HomesChurch Farm: progress this weekAwaiting approval
    • Weekly update, landownerMargaret Hale · The Hale familyChurch Farm: where things standAwaiting approval

    Drafting day and the days without contact are not set yet [?Q-016]

    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft
    4 drafts readyChurch Farm, Rugby: chasers and weekly updates for the week of Mon 9 Nov, drafted 07:00

    For the week of Mon 9 Nov the system drafted a chaser to Hadley & Finch LLP, a board-date chaser to Calder Valley Homes for 12 Nov, and a weekly update each for the RP and the landowner, and told Dana Whitfield the 4 drafts are ready; they are listed on the Legals tab.

  9. 9 Review and send the chasers

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula

    Drafts for the week of Mon 9 Nov

    4 drafts · from Dana Whitfield’s mailbox
    • Solicitor chaserAlex Rowan · Hadley & Finch LLPChurch Farm, Rugby: open items this weekAwaiting approval
    • Board-date chaserSarah Lomax · Calder Valley HomesChurch Farm: your board paper for 12 NovemberAwaiting approval
    • Weekly update, RPSarah Lomax · Calder Valley HomesChurch Farm: progress this weekAwaiting approval
    • Weekly update, landownerMargaret Hale · The Hale familyChurch Farm: where things standAwaiting approval

    Drafting day and the days without contact are not set yet [?Q-016]

    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    Dana Whitfield opens each draft, uses Edit 1 on the wording or the recipients (or Drop to discard one) and presses Approve and send 2. Each email goes from Dana’s own mailbox and is logged on the Site; the solicitor chaser carries no opt-out line, and the landowner update can go because The Hale family’s consent to email is recorded.

  10. 10 Decide the abnormal cost claim and read the variance

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Change and abnormal log

    Claims above £50,000 go to a Partner / MD (admin-set value)
    Abnormal Build Cost Claim · Westbrook ConstructionApproved+£74,000
    Submitted
    21 Oct 2026
    Change type
    Unforeseen ground conditions
    Initiated by
    Contractor
    Recorded by
    Conor Higgins
    Original breakdown
    • Substructure£540,000

    £540,000

    Revised breakdown
    • Substructure£540,000
    • Piling to plots 1–9£74,000

    £614,000

    ESEleanor ShawFinance partner · approver above the set value

    Approved by Eleanor Shaw, 28 Oct 2026: the change log, the package, the fee and each party’s exposure follow the approved amount

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Build +£74,000: the approved abnormal claim

    Westbrook Construction submitted Valere’s Abnormal Build Cost Claim; Conor Higgins presses Record claim 1 and enters the change type, the initiator, the evidence and the original and revised breakdowns. It is above £50,000, so Eleanor Shaw is named and presses Approve 2. The variance then reads build £6,320,000 → £6,394,000 and package £9,960,000 → £10,034,000; land and fee have no change.

  11. 11 Record exchange

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    When contracts exchange Dana Whitfield presses Record exchange, enters the date 1 and the final land, build and fee values 2, and presses Confirm 3. The Site is at Exchanged, the Fee and Heads of Terms values are revised from the figures entered, the exchange milestone closes on its own, and the fees whose trigger occurred show as triggered.

  12. 12 Record completion; fees flagged until invoiced

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Completed Land & Build Closed record · read-only Triggered fee not yet invoiced LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Stages

    Each move is set by the event its module records
    1. Lead10 stages done
    2. Instructed3 Aug
    3. Acceptable Offer26 Aug
    4. Acceptable Build14 Sep
    5. Under Offer14 Sep
    6. Legals
    7. Exchanged13 Nov
    8. Completed4 Dec

    Completion

    Recorded by Dana Whitfield
    Completed
    4 Dec 2026
    Final land
    £3,640,000
    Final build
    £6,394,000
    Final fee
    £262,000
    Legals readiness
    • Milestones complete
    • Fee invoice raised: 1 of 2 triggered fees

    Each triggered fee with no invoice keeps its flag on the Site and in Legals’ weekly controls until it is marked invoiced, even after completion.

    Fees

    Fee agreement signed 3 Aug

    Agency fee (RP)

    Invoiced
    £130,000Agreed
    Trigger
    At exchange
    1. Triggered13 Nov
    2. Invoiced16 Nov

    Overage

    Not triggered
    £20,000Contingent
    Trigger
    At the overage event
    1. Triggered
    2. Invoiced

    Contractor introduction

    Triggered
    £72,000Agreed
    Trigger
    At JCT signing · 50/50 split
    1. Triggered13 Nov
    2. Invoiced

    Triggered fee not yet invoiced

    Invoice date

    Design / RM

    Not triggered
    £40,000Speculative
    Trigger
    At Reserved Matters approval · trigger to be confirmed [?Q-005]
    1. Triggered
    2. Invoiced

    Dana Whitfield presses Record completion, enters the final values 1 and confirms; later, on Fees, Dana sets the invoice date 2 and presses Mark invoiced 3 on each triggered fee. The Site is Completed, a closed record; the contractor introduction fee keeps “Triggered fee not yet invoiced” until it is marked invoiced, even after completion.

  13. 13 Alternative: an agreement is declined in Adobe Sign

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Land and Build · revision 1
    Issued
    Land£3,640,000
    Build£6,320,000
    Package£9,960,000
    Fees£262,000
    Effective rate2.6%
    Exclusivity date23 Nov
    Heads of Terms, Church FarmNot signed
    1. Sent25 Sep 2026To 3 signatories through Adobe Sign
    2. Declined by Westbrook Construction, 29 Sep 2026Returned by Adobe Sign
    3. Signed copyNot filed
    Revise makes revision 2, generated and approved again

    Next action

    Raised for the sender
    • Revise or resend the Heads of TermsPartnershipsToday

    A declined fee agreement would also notify Partners / MD.

    Alternative: Adobe Sign returned the Heads of Terms as declined by Westbrook Construction on 29 Sep 2026; the sender is notified and given a Next Action. Dana Whitfield chooses Revise 1 (a new revision, generated and approved again) or Resend 2.

  14. 14 Alternative: the Adobe Sign connection is not set up

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Land and Build · revision 1
    Approved
    Land£3,640,000
    Build£6,320,000
    Package£9,960,000
    Fees£262,000
    Effective rate2.6%
    Exclusivity date23 Nov

    Agreements

    • Heads of Terms, Church FarmApproved
    • Exclusivity agreement · Standard letter, back-to-backApproved

    Alternative: Dana Whitfield presses Send for signature 1, but the Adobe Sign connection is not set up or was refused. Sending is blocked with an error that names the connection, the admin is told, and the draft stays approved.

  15. 15 Alternative: a critical date slipping

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: HighStalled: critical Legals task past deadline Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    System entry in Activity, Fri 6 Nov 2026: counts as a legal blocker on the Friday Legals view and the MD’s exceptions
    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Critical path · 14 days late
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft
    Stall alert: Church Farm
    Valere CRM <notifications@valere.example> → Dana Whitfield <dana.whitfield@valere.example>
    Valere CRMNotification
    Stall alert

    Church Farm has stalled

    Stalled: critical Legals task past deadline.

    CE-014Church Farm, Rugby
    Legals
    Deal Health
    55
    Deadline was
    Mon 26 Oct 2026
    Late
    11 days
    Task
    Land contract draft, with Hadley & Finch LLP for 18 days · critical path
    Rule
    Critical Legals task past its deadline (threshold set by Admin) [?Q-002]

    You get one alert when the rule starts, not one a day, and Rhys Calloway has been told as MD.

    Open Church FarmSee why the rule fired

    You received this because you own the Site.

    Valere CRM · from the Valere notification mailbox, only to Valere staff

    Alternative: the land contract draft is past its deadline of 26 Oct 2026 on the critical path, so the Site shows “Stalled: critical Legals task past deadline”, a system entry is written on Fri 6 Nov 2026, and the stall letter reaches Dana Whitfield with the MD told. Dana presses Update 1 and sets a new holder 2, a moved deadline 3 with the original kept, or a note 4.

  16. 16 Alternative: the longstop date passes

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    38days overdue
    13 NovMoved once
    CompletionTarget
    17days overdue
    4 DecSet 5 Oct
    LongstopHard date
    3days overdue
    18 DecIn the contract
    HoTs to exchange
    23days left
    13 JanDay 77 of 100

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    Alternative: on Mon 21 Dec 2026 the longstop of Fri 18 Dec 2026 has passed. Dana Whitfield is notified and given a Next Action, and the Site counts as a legal blocker; every countdown reads overdue in red. Dana presses New longstop 1 with its reason, or Close Site 2; the earlier longstop stays in the history.

  17. 17 Alternative: exclusivity ends in 14 days

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Exclusivity

    Standard letter, back-to-back · to 23 Nov 2026

    14 days left · extension letter drafted for Land

    Extension letter · end date 23 Nov 2026 → 18 Dec 2026Drafted 9 Nov 2026 from Valere’s templateAwaiting approval

    Once it is signed, the end date moves. If it is not signed by the end date, the period becomes ended and the owner is notified.

    Next action

    • Approve the extension letterLandToday
    Exclusivity on Church Farm ends in 14 days
    Valere CRM <notifications@valere.example> → Sophie Brennan <sophie.brennan@valere.example>
    Valere CRMNotification
    Exclusivity ending

    Exclusivity on Church Farm ends in 14 days

    It ends on Mon 23 Nov 2026.

    CE-014Church Farm, Rugby
    Legals
    Ends
    Mon 23 Nov 2026
    Left
    14 days
    Fee
    £262,000

    Exclusivity on Church Farm, Rugby ends on Mon 23 Nov 2026. An extension letter to Fri 18 Dec 2026 is drafted for you. You will be told again if it ends.

    Open Church FarmOpen Heads of Terms

    You received this because Heads of Terms and Exclusivity names you on this Site. Your cover is told while you are out of office.

    Valere CRM · from the Valere notification mailbox, only to Valere staff

    Alternative: exclusivity ends on 23 Nov 2026. Sophie is notified with the exclusivity letter and a Next Action, and the extension letter to 18 Dec 2026 is already drafted; Sophie Brennan presses Approve 1, then Send for signature 2. Once signed, the end date moves; unsigned by the end date, the period becomes ended.

  18. 18 Alternative: the claim needs more, or has no approver

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Change and abnormal log

    Claims above £50,000 go to a Partner / MD (admin-set value)
    Abnormal Build Cost Claim · Westbrook ConstructionMore information+£74,000
    Submitted
    21 Oct 2026
    Change type
    Unforeseen ground conditions
    Initiated by
    Contractor
    Recorded by
    Conor Higgins
    Original breakdown
    • Substructure£540,000

    £540,000

    Revised breakdown
    • Substructure£540,000
    • Piling to plots 1–9£74,000

    £614,000

    ESEleanor ShawFinance partner · approver above the set value
    Decision history
    • More information, Eleanor Shaw: the claim stays open

    A later decision is a new entry; this one is kept. A claim approved in part counts only the approved amount in the variance.

    Above the set value with no Partner / MD named
    No Partner / MD namedThe claim is above £50,000, so the decision cannot be recorded until an approver is named.

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,320,000No change
    Package£9,960,000£9,960,000No change
    Valere fee£262,000£262,000No change

    Claim: no cost effect until it is decided

    Alternative: Eleanor Shaw presses More information 1 and the claim stays open, with no cost effect until it is decided; a later decision is a new entry and this one is kept. Above £50,000 with no Partner / MD named, the decision cannot be recorded.

  19. 19 Alternative: an email proposes a legal date

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    1days left
    13 NovMoved once
    CompletionTarget
    22days left
    4 DecSet 5 Oct
    LongstopHard date
    36days left
    18 DecIn the contract
    HoTs to exchange
    62days left
    13 JanDay 38 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 24 days · critical, 17 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2426 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1511 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes712 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Proposed update

    Proposed
    Board approval, first roundOpenApproved 12 Nov 2026

    Sarah Lomax, Calder Valley Homes: “Our board approved Church Farm today.”

    Nothing changes until you accept it; the email stays linked.

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft
    A proposed update on Church Farm is waiting for you
    Valere CRM <notifications@valere.example> → Dana Whitfield <dana.whitfield@valere.example>
    Valere CRMNotification
    Proposed update

    A proposed update is waiting

    One change, read from an email. Nothing changes until you accept it.

    CE-014Church Farm, Rugby
    Legals
    Milestone
    Board approval, first round
    Proposed
    Approved Thu 12 Nov 2026
    Source
    Email from Sarah Lomax, Calder Valley Homes, Thu 12 Nov 2026
    Quote
    “Our board approved Church Farm today.”

    Valere CRM read an email from Calder Valley Homes and proposes one change to Church Farm, Rugby. Look at it beside the email, then accept or discard it.

    Review the proposed updateOpen the source email

    You received this because you own the Site. Nothing on it changes until you accept.

    Valere CRM · from the Valere notification mailbox, only to Valere staff

    Alternative: Sarah Lomax of Calder Valley Homes writes that its board approved on 12 Nov 2026. On that day the proposed update shows on the board approval milestone with the email linked, and the proposed update letter reaches Dana Whitfield; nothing changes until Dana presses Accept 1, or Discard 2.

  20. 20 Alternative: exchange with items still open

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Legals Land & Build Priority: High Legals is owned jointly byLandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    StatusActive
    Construction InvolvedYes
    Deal HealthFairProvisional formula
    ExchangeTarget
    4days left
    13 NovMoved once
    CompletionTarget
    25days left
    4 DecSet 5 Oct
    LongstopHard date
    39days left
    18 DecIn the contract
    HoTs to exchange
    65days left
    13 JanDay 35 of 100
    Oldest outstanding

    Land contract draft

    With Hadley & Finch LLP for 21 days · critical, 14 days late

    Variance against Heads of Terms

    HoTs signed 5 Oct
    ItemHeads of TermsNowChange
    Land price£3,640,000£3,640,000No change
    Build cost£6,320,000£6,394,000+£74,000 (1.2%)
    Package£9,960,000£10,034,000+£74,000 (0.7%)
    Valere fee£262,000£262,000No change

    Critical items

    Land · Build · Scheme

    Land

    • Land contract14 days late
    • Easement enquiry12 days open

    Build

    • JCT amendments2 days late
    • ProposalsDue 11 Nov

    Scheme

    • S106 variationBlocked: council
    • Condition 9Due 16 Nov

    Fee controls

    No fee flag up
    • Fee agreementSigned 3 Aug 2026
    • Triggered, not invoicedNone yet · agency at exchange
    • Exclusivity ends 23 NovExtension letter drafted

    Legal progress

    5 of 11 closed · 4 critical open · board dates 12 and 20 Nov
    MilestoneHeld byDaysDeadlineStatus
    Heads of Terms agreedValere–5 OctClosed
    Land contract draftCritical pathHadley & Finch LLP2126 OctIn progress
    Contractor’s ProposalsCritical pathWestbrook Construction1211 NovIn progress
    Board approval, first roundCritical pathCalder Valley Homes412 NovOpen
    ExchangeCritical pathAll parties–13 NovOpen

    Contracts out

    3 with others · weekly chaser to the solicitor drafted today
    DocumentWithSinceDaysStatus
    Land contractHadley & Finch LLP19 Oct21Draft awaited
    Development agreementCalder Valley Homes’ solicitors2 Nov7Draft
    JCT contractWestbrook Construction28 Oct12Draft

    Alternative: at Record exchange the product warns about the open critical items; it warns and does not block. Dana Whitfield presses Continue 1, and continuing is written to the audit log.

  21. 21 Alternative: system, Heads of Terms open too long

    Updated 12m agoJMCHRC
    CE-014

    Church Farm, Rugby

    Under Offer Land & Build Stalled: Heads of Terms open over 30 days LandPartnershipsConstruction
    LandownerThe Hale family
    LandSBSophie Brennan
    Partnerships PMDWDana Whitfield
    ConstructionCHConor Higgins
    Region · unitsCentral· 28
    Construction InvolvedYes
    Valere fee£262,000

    Heads of Terms

    Land and Build · revision 1
    Issued
    Land£3,640,000
    Build£6,320,000
    Package£9,960,000
    Fees£262,000
    Effective rate2.6%
    Exclusivity date23 Nov

    Agreements

    • Heads of Terms, Church FarmOut for signature
    • Exclusivity agreement · Standard letter, back-to-backOut for signature
    Stall rule: Heads of Terms issued and unsignedOut for signature since Fri 25 Sep 2026: open 31 days on Mon 26 Oct 2026. Rule “HoTs open over 30 days” · threshold 30 d, seeded from the sources, not changed since; the Admin can edit it [?Q-002].

    Activity

    • SystemStall rule · Mon 26 Oct 2026

      Church Farm, Rugby flagged stalled: Heads of Terms open over 30 days, threshold 30 d

    Alternative: the Heads of Terms stayed issued and unsigned beyond the 30-day stall threshold, so on Mon 26 Oct 2026 the stall rules flagged the Site as stalled and wrote a system activity; the badge names the rule, the alert the threshold applied.